Manufacture Registration Scheme

Background & Objects of Factory Registration

Enactment Background of the Registration System

The factory registration system was introduced to allow overseas gas-related product manufactures to register with the Korea government only when they meet the technical standards, facility standards, and quality control system standards set by the Korea government.
For factory registration, overseas manufactures must comply with the factory audit conducted by the Korea Gas Safety Corporation, and only the products of registered overseas manufactures can be distributed in Korea through import inspection.

Objects of Factory Registration
High-Pressure Gas Cylinders,
etc. in accordance with
High-Pressure Gas Safety Act
  • 1. Cylinders for filling high-pressure gases (exculding those of which the internal volume is less than 3dl)
  • 2. Accessories of high-pressure gas cylinder (valve and safety valve)
  • 3. High-pressure gas tank, tank fixed to vehicles and pressure vessel
  • 4. Compressor, Condenser, evaporator and presssure vessel consisting of specified equipment for refrigeration (excluding unit refrigerator)
  • 5. Emergency cut-off device
  • 6. Safety valve
  • 7. Valve fot toxic gas pipe
Gas appliances in accordanance
with Safety Control and
Business of Liquefied
Petroleum Gas Act
  • 1. Pressure Regulators
  • 2. Automatic Shut-off Device for Gas Leakage
  • 3. Filters for Govemor Stations
  • 4. Govemors for Underground Use
  • 5. Hoses for Gases
  • 6. Valves for Pipes
  • 7. Cocks
  • 8. Joints for Pipes
  • 9. Forced Mixed Type Gas Burners
  • 10. Gas Burning Appliances
  • 11. Multifunctional Gas Meters
  • 12. Loading Arms
  • 13. Multifunctional boilers
Economic Promotion and
Safety Control of Hydrogen Act
  • 1. Fuel Cells(Fixed)
  • 2. Portable Fuel Cells
  • 3. Water Electrolysis Hydrogen Generator
  • 4. Hydrogen Generators Using Fuel Processing Technologies

* See [Factory Registration Guide] for further detail

Factory Registration Work Flow

  1. Preparation

    Prior Consultation

    KGS

  2. Technical Review

    Apply for Technical Review

    Technical Review

    Issue Technical Review Report

    KGS

  3. Factory Audit

    Apply for Factory Audit

    Factory Audit

    Issue Factory Audit Report

    KGS

  4. Factory
    Registration

    Apply for Factory Registration

    Registration Review

    Issue Certificate

    Korea Government

  5. Re-newal
    Registration

    Apply for Re-newal
    Registration

    KGS

* See [Factory Registration Guide] for further detail on required document and work flow of initial, renewal, alteration Audit.

Factory Audit Fee

Fees Table Required for Factory Audit - Classification, Basic fee(KRW)
Classification Basic fee(KRW)
Initial Audit Cylinders
Storage Tanks
Tanks fixed to vehicle
Pressure Vessels
Specified equipment for refrigeration
14,490,000
Cylinders
Accessories
Emergency cut-off devices
Safety Valves
Valves for toxic gas pipes
Gas appliances
Hydrogen Appliances
12,310,000
Renewal Audit Cylinders
Storage Tanks
Tanks fixed to vehicle
Pressure Vessels
Specified equipment for refrigeration
12,310,000
Cylinders
Accessories
Emergency cut-off devices
Safety Valves
Valves for toxic gas pipes
Gas appliances
Hydrogen Appliances
10,350,000
Alteration Audit change of codes/standards/classifications
(Excluding change in location of factory)
3,610,000
Re-audit On-site audit 6,860,000
Documental audit 2,070,000
Additional fee for adding codes/standards/classifications 1,440,000
Technical Review In case of the number of registration codes/standards/classifications is 4 or more(4~) 5,366,000
In case of the number of registration codes/standards/classifications is less than 4(1~3) 3,834,000
Travel Expenses Airfare, accommodations and other expenditure are calculated based on KGS's criteria
Korea Government Initial or Renewal Audit(Cylinders, etc., Hydrogen Appliances) 25,000
Initial or Renewal Audit(Gas Appliances) 30,000
Alteration 15,000
Note 1 In case of different codes/standards/classifications are audited at the same time, the basic audit fee shall be the highest among them.
Note 2 Audit period(audit days) may increase depending on the number of codes/standards/classifications to be audited.
Note 3 Additional fee is added for each codes/standards/classifications
Note 4 If the location of the manufacturing factory changes, it is considered as a ‘initial audit’.(not the ‘alteration audit’)
Note 5 If refund of audit fee is requested in written form prior to the date of appointing the person in charge, the fee will be refunded as below
- 7 days advance request : 100%
- 3 days advance request : 60%
- 1 days advance request : 20%

Download Related Documents

* This information has been translated from Korean version and there may be some difference in interpreting the contents of the laws and regulations between the English version and Korean version.

For more information, please contact us by

Address : 1390 Wonjung-ro, Maengdong-myeon, Eumseong-gun, Chungcheongbuk-do, Korea (27738)

  • Contact Point :
    - (Pressure Vessel) Sungman Ko (E: ksm100@kgs.or.kr, Tel: +82-43-750-1605)
    - (Cylinder etc.) Kyoungchol Park (E: pkc@kgs.or.kr, Tel: +82-43-750-1601)
    - (Appliance) Sangwoo Lee (E: kgslsw@kgs.or.kr, Tel: +82-43-750-1224)